Sell on FurnDim

Modular Double-S Curve Serpentine Commercial Reception Desk Specifications

RCV-S6400-3800Code:U5VNQ8V1

Modular Double-S Curve Serpentine Commercial Reception Desk (model RCV-S6400-3800) is listed under Fabric Office Sofa. Dimensions: 6400 × 3800 × 1150 mm. Materials: 30x30x3 mm galvanized square steel tube. Load capacity: 250 kg. Product Features: Modular,construction,Double-S,serpentine,shape,Dual-height,transaction,counter,Commercial,lobby,furniture. This page consolidates 6 groups of specifications and GB / EN / ANSI/BIFMA standard references, with metric and imperial units. 1 supplier(s) are listed and you can request a quote online.

Request supplier quotes
2026-09-17 11:57Popularity: 34
BrandJUESHANGDAModelRCV-S6400-3800
Overall dimensions (W × D × H)6400 × 3800 × 1150 mmOverall footprint6400 x 3800 x 1150 mm
Staff work surface height750 mmVisitor counter top height1150 mm
Staff work surface depth500 mmVisitor overhang counter depth500 mm
Modesty panel thickness100 mmService gap width between panels100 mm
Central entry indent width1400 mmOuter end segment arc length7461 mm
Short straight work segment length1200 mmWorktop thickness40 mm
Steel support spacing1200 mmKick plate height80 mm
Finished Top Thickness50 mmEffective Knee Clearance680 mm high and 900 mm wide per main seat
Leg / Support Section80 mm main section with 2 mm metal wallWorktop static load capacity250 kg
Drawer slide load rating45 kgDrawer slide cycle rating50000 cycles
Recommended seated staff capacity6 peopleTotal assembled product weight1500 kg
Steel frame salt spray resistance72 hoursFormaldehyde emission level0.05 mg/m³
Surface scratch resistance3HTop Static Load Reference150 kg uniformly distributed
Drawer Slide Load / Life45 kg/pair; 50000 cyclesInternal support frame30x30x3 mm galvanized square steel tube
Structural substrate18 mm fire-treated E0 grade plywoodStaff work surface finish40 mm wear-resistant high-pressure laminate
Visitor counter top18 mm acrylic solid surfaceModesty panel core18 mm MDF with matte paint finish
Base kick plate1.5 mm brushed stainless steelAdjustable foot pads12 mm diameter nylon with steel threaded stem
Drawer hardwareCold-rolled steel ball-bearing slidesCable grommets80 mm diameter ABS plastic with brush seal
Primary Panel Thickness25 mm; load-bearing top may use 40 mm composite build-upEdge Band Thickness2 mm
Metal Frame Wall Thickness2 mm cold-rolled steelModular segmented assemblyCurved and straight sections connect with steel corner brackets
Dual-height counter design750mm seated staff surface + 1150mm standing visitor surfaceIntegrated cable managementInternal trunking with 80mm grommets every 1200mm
Adjustable floor leveling15mm vertical adjustment range on foot padsOptional integrated storageLockable drawer pedestals fit under staff work surface
Custom logo embeddingRecessed logo mountable on visitor counter faceOptional LED accent lightingStrip lighting mountable under visitor counter overhang
Modular expandabilitySections connect to extend counter length for larger spacesCable Management CapacityReference capacity 10power/data cables; tray load 10 kg
Reference Reassembly CountMain joints should support 5controlled assembly cyclesNumber of shipping packages12 packages
Largest single carton dimensions2000 x 700 x 200 mmTotal shipping gross weight1650 kg
Total shipping volume3.36 CBMOn-site assembly time16 hours
20ft container loading capacity1 setRecommended packaging protectionWooden crating for solid surface segments
Reference Package Count1 set / 2 cartonsReference Assembly Time40 minutes per set
Reference Package DimensionsMain top 2500× 1050× 350 mm; return/pedestal packed separatelyLarge corporate office lobbiesServes as branded central reception point for multi-story commercial headquarters
Hotel and resort entry areasProvides multi-station check-in and guest transaction space for high foot trafficLarge medical and clinic facilitiesAccommodates multiple check-in staff while separating public and work zones
Government service centersSupports multiple public service windows with secure staff work areasPremium retail and showroom entrancesDelivers high-impact brand presence with customer transaction counter space
Convention and event centersProvides modular, scalable registration counter for large event attendee check-in——
Correction History (visible to all visitors)
TimeFieldOriginal ValueCorrected ValueNote / Status
No correction records yet. Found an error? Click the flag at the end of a row to report it.

Suppliers and stock

1 active supplier(s) >>
PRODUCT MODULE 01 / 06

Physical Dimensions

Automatic mm / inch conversion · Core engineering specifications

Data source: Structured from factory data; final measured values prevail.

Overall dimensions (W × D × H)6400 × 3800 × 1150 mm
Overall footprint6400 x 3800 x 1150 mm
Staff work surface height750 mm
Visitor counter top height1150 mm
Staff work surface depth500 mm
Visitor overhang counter depth500 mm
Modesty panel thickness100 mm
Service gap width between panels100 mm
Central entry indent width1400 mm
Outer end segment arc length7461 mm
Short straight work segment length1200 mm
Worktop thickness40 mm
Steel support spacing1200 mm
Kick plate height80 mm
Finished Top Thickness50 mm
Effective Knee Clearance680 mm high and 900 mm wide per main seat
Leg / Support Section80 mm main section with 2 mm metal wall
PRODUCT MODULE 02 / 06

Weight, Load & Performance

Net weight / load capacity / users / durability

Data source: Product performance data; verify exact test conditions before procurement.

Worktop static load capacity250 kg
Drawer slide load rating45 kg
Drawer slide cycle rating50000 cycles
Recommended seated staff capacity6 people
Total assembled product weight1500 kg
Steel frame salt spray resistance72 hours
Formaldehyde emission level0.05 mg/m³
Surface scratch resistance3H
Top Static Load Reference150 kg uniformly distributed
Drawer Slide Load / Life45 kg/pair; 50000 cycles
PRODUCT MODULE 03 / 06

Materials & Structure

Core acceptance fields · Panels / hardware / frame / upholstery

Data source: Subject to the factory material list and inspection report.

Internal support frame30x30x3 mm galvanized square steel tube
Structural substrate18 mm fire-treated E0 grade plywood
Staff work surface finish40 mm wear-resistant high-pressure laminate
Visitor counter top18 mm acrylic solid surface
Modesty panel core18 mm MDF with matte paint finish
Base kick plate1.5 mm brushed stainless steel
Adjustable foot pads12 mm diameter nylon with steel threaded stem
Drawer hardwareCold-rolled steel ball-bearing slides
Cable grommets80 mm diameter ABS plastic with brush seal
Primary Panel Thickness25 mm; load-bearing top may use 40 mm composite build-up
Edge Band Thickness2 mm
Metal Frame Wall Thickness2 mm cold-rolled steel
PRODUCT MODULE 04 / 06

Functions & Adjustment

Adjustment / rotation / tilt / mobility / storage features

Data source: Functional configuration; the supplier specification prevails.

Modular segmented assemblyCurved and straight sections connect with steel corner brackets
Dual-height counter design750mm seated staff surface + 1150mm standing visitor surface
Integrated cable managementInternal trunking with 80mm grommets every 1200mm
Adjustable floor leveling15mm vertical adjustment range on foot pads
Optional integrated storageLockable drawer pedestals fit under staff work surface
Custom logo embeddingRecessed logo mountable on visitor counter face
Optional LED accent lightingStrip lighting mountable under visitor counter overhang
Modular expandabilitySections connect to extend counter length for larger spaces
Cable Management CapacityReference capacity 10power/data cables; tray load 10 kg
Reference Reassembly CountMain joints should support 5controlled assembly cycles
PRODUCT MODULE 05 / 06

Packaging & Logistics

Verified carton / gross weight / assembly / loading data

Data source: Reference for export quotations and container planning.

Number of shipping packages12 packages
Largest single carton dimensions2000 x 700 x 200 mm
Total shipping gross weight1650 kg
Total shipping volume3.36 CBM
On-site assembly time16 hours
20ft container loading capacity1 set
Recommended packaging protectionWooden crating for solid surface segments
Reference Package Count1 set / 2 cartons
Reference Assembly Time40 minutes per set
Reference Package DimensionsMain top 2500× 1050× 350 mm; return/pedestal packed separately
PRODUCT MODULE 06 / 06

Applications & Usage

Recommended spaces / users / usage modes

Data source: Recommended applications based on product form and category.

Large corporate office lobbiesServes as branded central reception point for multi-story commercial headquarters
Hotel and resort entry areasProvides multi-station check-in and guest transaction space for high foot traffic
Large medical and clinic facilitiesAccommodates multiple check-in staff while separating public and work zones
Government service centersSupports multiple public service windows with secure staff work areas
Premium retail and showroom entrancesDelivers high-impact brand presence with customer transaction counter space
Convention and event centersProvides modular, scalable registration counter for large event attendee check-in
STANDARD S1

EU Market Entry Requirements * EN Standards

EU Market Access Requirements* EN Standards

EN 527-2:2002+A1:2016Office work tables safety and strength requirements, applicable to staff work surface
EN 13722:2004Furniture strength and durability for reception counters, applicable to structural testing
STANDARD S2

North America Purchasing & Inspection Reference * ANSI/BIFMA Standards

US and Canada office-furniture standards

ANSI/BIFMA X5.5-2021Desk products standard for safety, durability and structural performance
ANSI/BIFMA e3-2019Furniture sustainability standard for material emissions and environmental impact
STANDARD S3

Standards Applicable to China-Market Projects * GB Standards

Standards applicable to China-market projects

GB/T 3324-2017General technical requirements for wooden furniture, applicable to structural performance
GB 18580-2017Formaldehyde emission limits for wood-based panels, applicable to substrate materials
GB 20286-2006Fire performance requirements for public place furniture, applicable to high-traffic lobbies
Standardized tender description text
This product must meet the following technical requirements:
1. GB/T 3324-2017: General technical requirements for wooden furniture, applicable to structural performance;
2. GB 18580-2017: Formaldehyde emission limits for wood-based panels, applicable to substrate materials;
3. GB 20286-2006: Fire performance requirements for public place furniture, applicable to high-traffic lobbies;
Final delivery parameters, test reports, and acceptance criteria are subject to the purchase contract.
GENERATED EXPORTS

Ready-to-use export tools

Export data is generated from the current published product record.

Technical Report PDF

Directly download an English report in metric or imperial units.

PDF · RCV-S6400-3800

Complete Parameter Workbook

Download all product information and parameter modules in English.

XLSX · RCV-S6400-3800

International Listing Template

English title, specifications, materials, standards and purchasing fields.

XLSX · LISTING

Customs Declaration Data

Prepare customs description, material, usage, dimensions and declaration elements.

CUSTOMS · RCV-S6400-3800Open Export Tool

Quick Actions

Post an RFQ

Product Description

The Modular Double-S Curve Serpentine Commercial Reception Desk (model RCV-S6400unbranded) is a purpose-built front counter designed to serve as a polished, high-capacity focal point for high-traffic commercial entry spaces. Its distinctive flowing double-S serpentine layout creates an organic, welcoming silhouette that softens large lobby volumes, with a 1400mm wide central entry indent for clear staff access between public visitor zones and internal work areas, paired with a 100mm wide service gap between panels to support smooth transaction flow. The unit has an overall footprint of 6400 x 3800 x 1150 mm, with a dual-height design pairing a 750mm tall seated staff work surface and 1150mm tall standing visitor counter, each with 500mm depth, and 100mm thick modesty panels to obscure work areas from public view. Constructed for long-term commercial use, the desk is built on an internal frame of 30x30x3mm galvanized square steel tube, with a base made of powder-coated metal and 1.5mm brushed stainless steel kick plates. The structural core uses 18mm fire-treated E0 grade plywood, with a formaldehyde emission level of 0.05 mg/m³. The staff work surface features a 40mm wear-resistant high-pressure laminate finish, the visitor counter uses 18mm acrylic solid surface, and modesty panels have an 18mm MDF core with matte paint finish. Adjustable 12mm diameter nylon foot pads with steel threaded stems offer 15mm of vertical adjustment to level the unit on uneven floors. The worktop supports a 250kg static load, with cold-rolled steel ball-bearing drawer slides rated for 45kg load capacity and 50000 open-close cycles; the steel frame delivers 72 hours of salt spray resistance for durability in variable conditions. Functional design elements support daily front-of-house operations: modular curved and straight sections connect via steel corner brackets for simplified installation. Integrated internal cable trunking includes 80mm ABS brush-seal grommets positioned every 1200mm to keep work surfaces free of cord clutter. Optional add-ons include lockable under-desk drawer pedestals for secure storage, recessed custom logo mounting on the visitor counter face, and LED accent strip lighting fitted under the counter overhang to boost ambient visual appeal. The desk supports 6 seated staff, creating clear separation between public and work zones. This reception desk is ideal for large corporate office lobbies as a branded central welcome point for multi-story headquarters, high-foot-traffic hotel and resort entry areas for multi-station check-in, large medical and clinic facilities for patient check-in, government service centers for public service windows, premium retail and showroom entrances for high-impact brand presence, and convention centers for scalable event registration. For procurement planning, note the unit is delivered in 12 shipping packages, with a total shipping gross weight of 1650 kg and total shipping volume of 3.36 CBM; the largest single carton measures 2000 x 700 x 200 mm, one unit fits in a 20ft container, on-site assembly takes 16 hours, and the total assembled product weight is 1500 kg.

Parameter Correction - RCV-S6400-3800 · U5VNQ8

Edit incorrect parameters

Upload evidence (optional)

Up to 5 files, 10 MB each. JPG, PNG, WebP, PDF, Word and Excel are supported.

Error description (required)

Contact (optional)

Comparison list0